Not the best computer generation mock up I have ever seen.. Looks like somewhere Noddy would live...
Saltdean LIdo is under construction right now. No thanks to Brighton council who wouldn't pay their share when it was found that an electricity sub station had been removed. The company had to raise another £70K, which wasn't expected.
http://www.bbc.co.uk/news/uk-england-sussex-35254817
Commencing 2025, with a vastly scaled down, visually unimpressive contender for a part in a new Channel 4 series called Bland Designs.
An open air pool is going to be a kick in the teeth for Saltdean Lido.
Spot the deliberate mistake in that photo......
the i360 and the wheel in operation simultaneously?
They were basically given the site on the proviso they fund it themselves. Can't go cap in hand after that.Saltdean LIdo is under construction right now. No thanks to Brighton council who wouldn't pay their share when it was found that an electricity sub station had been removed. The company had to raise another £70K, which wasn't expected.
http://www.bbc.co.uk/news/uk-england-sussex-35254817
I would suggest that the council haven't been the villains that they've been made out here. The public relations of the Lido cic do sometimes leave a bit to be desired. Which is a shame really.
I would think almost everybody in saltdean supports the cic and want it to do well. However it's a year behind schedule and a lot of things previously offered at the community centre in the Lido building are now being quietly scaled down. Also all the section 106 money from the grand ocean development has now gone so nothing left to support any other community developments in the area. It's basically all or nothing on the Lido scheme
They were basically given the site on the proviso they fund it themselves. Can't go cap in hand after that.