The Eastbound train problem is the same as before, people are still being stopped from entering the platform when it is not full, so the trains are leaving about two thirds full. There was one carriage with 2 people in while the queues for the platform went back to the top of the gangways.
The gangways themselves accumulate large puddles when it rains, surely the builders should be called back to correct this.
You can still hear very little in the WSU in the way of announcements, I actually think some of the speakers are no longer working as it was ok when the stadium opened.