Convert your measurements to metres then multiply7600mm long x 250mm width x 450mm deep
and
8900mm long x 150mm width x 300mm deep.
How many cubic metres of ballast do I need for my footings
Thanks
7600mm long x 250mm width x 450mm deep
and
8900mm long x 150mm width x 300mm deep.
How many cubic metres of ballast do I need for my footings
Thanks
As Hailsham Seagull has already said, approx 1.26 cu m. should be enough. However I always add at least 10% to allow for irregularities in the depth/width of the trench.
Also, they are very narrow footings, what widths are the walls you are building?
Do your own homework cheats never prosper.7600mm long x 250mm width x 450mm deep
and
8900mm long x 150mm width x 300mm deep.
How many cubic metres of ballast do I need for my footings
Thanks
I know a constipated Mathematician. He always works it out with a pencil.
I was thinking that, very narrow and not very deep.
Plus, where do you buy a shovel 150mm wide unless its a kiddies bucket and spade from the beach.
My mate Pat suggests turning your shovel sideways![]()