robbie c
Member
Emergency engineering works between Earlswood and Gatwick Airport is causing disruption to trains between East Croydon and Gatwick Airport. This is expected to continue until 12:30.
The following alterations will apply:
•Trains between East Croydon and Gatwick Airport may be delayed by up to 45 minutes
•Thameslink services between London Bridge and Brighton are cancelled
•Services towards Gatwick Airport will not call at Coulsdon South, Merstham, Earlswood, Salfords or Horley. Passengers for these stations should travel to Redhill / Gatwick Airport for a service back to these stations
•Gatwick Express and Southern will run a reduced service
In addition Victoria Station is closed
looks like I am driving then
The following alterations will apply:
•Trains between East Croydon and Gatwick Airport may be delayed by up to 45 minutes
•Thameslink services between London Bridge and Brighton are cancelled
•Services towards Gatwick Airport will not call at Coulsdon South, Merstham, Earlswood, Salfords or Horley. Passengers for these stations should travel to Redhill / Gatwick Airport for a service back to these stations
•Gatwick Express and Southern will run a reduced service
In addition Victoria Station is closed
looks like I am driving then