Bold Seagull
strong and stable with me, or...
I've got another thread running on this, but it's a bit urgent so specifically, is it relatively straightforward to replace a PCB in this model of boiler?
To someone with reasonable confidence, is this simply a case of making sure the right wires and connectors go back in the right place, or is there other stuff to move out of the way, other components to tackle?
I can get the part, just wondering if it's easy enough to replace or not? (can't find much about it around the net other than a .pdf of the manual).
Thanks!
To someone with reasonable confidence, is this simply a case of making sure the right wires and connectors go back in the right place, or is there other stuff to move out of the way, other components to tackle?
I can get the part, just wondering if it's easy enough to replace or not? (can't find much about it around the net other than a .pdf of the manual).
Thanks!