jackalbion
Well-known member
- Aug 30, 2011
- 5,906
Absolutely fine I think 4 12 car Thameslinks an hour, easily accessible to London, Luton Airport, Gatwick Airport, Brighton etc, 24 hour Railway. Only stupid lack of foresight, is they've only built platforms on the slow line at Wixhams which will cause a few issues during engineering works, and if the park requires even more capacity, theres also a station on the otherside of the foot print at Kempston Hardwick, which in its current form wouldn't cope, but its being improved for the East - West Rail project so should be fine, that'll connect to Oxford, Milton Keynes, all over so pretty good coverage.Question for @jackalbion - if you have knowledge of that line, how do you think the network would cope?